Every engagement gets a dashboard like this one: what's done, what's in progress, hours logged, and deliverables as they're finished, all in one place. This is a sample from a Tier 1 engagement, not a real client's data, so you can see what working together actually looks like before you book a call.
Outbound Shipping Process Audit
Meridian Distribution Co. (sample) · Prepared by Brett Wendrzyk, LSS Black Belt
Tier 1: Process Audit
Day 9 of 10
Completion
Kickoff call
Floor walkthrough & data pull
Waste-point analysis
SOP library draft
Findings walkthrough call
Hours Logged
6.75
of an estimated 8–10 hrs for this tier
Jul 14 · Kickoff call0.50
Jul 16 · Floor walkthrough1.50
Jul 18 · Data review2.00
Jul 21 · Waste-point analysis2.25
Jul 23 · SOP drafting0.50
Deliverables
MAPProcess Map, v1Delivered Jul 18
SUMWaste-Point Findings SummaryDelivered Jul 21
SOPSample SOP Excerpt
LIBFinal SOP Library (complete)Pending completion
The Sample SOP Excerpt above is a real, working download, not a picture of one. The other three are shown as they'd appear mid-engagement.
Activity Log
Jul 23SOP library draft in progress, on track for early next week.
Jul 21Waste-point analysis complete. Four major contributors identified, details in the findings summary.
Jul 18Data pull complete. Starting root-cause analysis on the second-shift handoff delay.
Jul 16Floor walkthrough done. Confirmed the bottleneck sits in the second-shift handoff, not receiving as originally assumed.